While hiring extra machinery incurs additional costs, the use of small excavators can really speed up the renovation process and hence save time and reduce labour costs.
If you get a fixed price quote from your builder, these costs should be factored in. However, there can be unforeseen soil related problems such as striking rocks or large tree roots that can slow down work and increase costs.
Rubbish removal costs are often forgotten about in the planning stage, though for a large-scale excavation project they could add up quickly and blow your budget (having a contingency budget is key). Access to the building site has a big impact on the cost. For example, if site access is limited it may take two or three times as long to get the excavated soil out.
The cost for your earthmoving works could vary depending on the specific conditions of your site, and its proximity to a tip site.